Law no. 307/2006 on fire protection has recently undergone substantial amendments through Government Emergency Ordinance no. 17/2026 amending and supplementing certain normative acts (”GEO no. 17/2026”), which directly impact private and public operators that must comply with these obligations. The new provisions entered into force on 13 March 2026; however, some provisions become applicable starting 12 April 2026, as their implementation requires amending secondary legislation.
Main points of interest under GEO no. 17/2026:
New Sanctions for Non-Compliance with Fire Safety Obligations
Suspension and loss of validity of the fire safety permit ("ISU permit") are introduced as sanctions, each with distinct consequences. Suspension is temporary and does not automatically stop activity or cancel the operating permit issued by local authorities under GEO no. 99/2000. In contrast, loss of validity of the ISU permit ends the right to operate the building or installations subject to fire safety obligations. It changes the conditions on which the operating permit was issued.
The ISU permit becomes invalid if deficiencies are not corrected within the statutory deadlines, or if the requirements for issuance are not met, such as exceeding authorised combustible materials, hindering evacuation, or risking firefighter safety. When the permit is invalidated, authorities are notified, and the beneficiary must obtain a new permit through a simplified procedure.
In addition, existing administrative sanctions are tightened, and new ones are introduced, as follows:
- Certain administrative fines are no longer eligible for a 50% reduction upon immediate payment (e.g. fines of RON 20.000–50.000 and RON 30.000–100.000);
- The warning sanction is partially eliminated, except where the facility operates without a permit, but fire safety measures are fully operational;
- Four new categories of administrative offences are introduced, including specific sanctions for: exceeding maximum user capacity, blocking evacuation doors with a padlock or key, and using pyrotechnic articles in spaces open to the public.
Additional Obligations for Directors of Operators Subject to Fire Safety Regulations
When the installations serving fire safety requirements, used for detection, signalling, alarming, suppression, and/or evacuation, are not functioning, the operator's director has a cascading set of obligations:
- Within 24 hours of identifying the malfunction, you must notify the competent emergency inspectorate (”ISU”);
- Immediately implement alternative measures (permanent video surveillance, periodic inspections, temporary evacuation route lighting, etc.) as established in writing by internal act;
- If the deficiency cannot be remedied within 72 hours, suspend activity (except for production buildings applying alternative measures). The 72-hour period may be extended, at the directors' request, to a maximum of 30 days, provided that alternative measures are maintained;
- Within 24 hours of ordering the suspension or resuming activity, notify the inspectorate again.
An authorised individual or entity must certify remediation and recommissioning, which can be an ISU-authorised individual or an individual authorised to work on electrical installations. The inspectorate lifts the suspension within 5 business days of receiving the request.
In addition to the above, GEO no. 17/2026 introduces further obligations on directors, including:
- Ensuring attendance of technical personnel at training sessions organised by the inspectorates;
- Directors must periodically review legal operating conditions from a fire safety perspective. They must also regularly review inspection findings;
- Permanently maintaining evacuation routes passable during operations;
- Complying with maintenance schedules for fire safety installations;
- Informing the public about the absence of an ISU permit on their own websites.
Clear Deadlines for Processing Applications and Digitalisation of Procedures with IGSU
GEO no. 17/2026 introduces clear deadlines for processing applications, as follows:
- Fire safety notice: application processed within a maximum of 15 calendar days;
- Fire safety permit: application processed within a maximum of 30 business days;
- Fire safety notice for investment works funded through EU funds or national programmes: application processed within a maximum of 5 business days.
If the 30-business-day deadline is missed, the inspectorate issues a one-time, 60-day provisional permit based on the beneficiary’s authenticated affidavit confirming all conditions are met.
Applications for notices and permits must be submitted only in electronic format. Both the beneficiary and the technical documentation authors must sign with qualified electronic signatures. Submission by e-mail is allowed until 31 December 2026. After that, the dedicated electronic platform created by the General Inspectorate for Emergency Situations (”IGSU”) must be used.
The ISU permit is valid only when accompanied by signed technical documentation (printed, electronic, or scanned). The beneficiary must display a copy of the ISU permit inside the building, visible to the public.
Register of Facilities Requiring and Holding an ISU Permit
IGSU posts a monthly list of all facilities that require and hold an ISU permit on its website, organised by county and building category. The list shows the permit registration number, the operator or institution's name and address, and the field of activity.
New Obligations Applicable to the Design and Construction Phases
GEO no. 17/2026 introduces new responsibilities for site supervisors, who must monitor the implementation of fire safety measures, verify the proper functioning of installations prior to commissioning, and electronically notify the inspectorates of any identified non-conformities.
Designers must provide documentation and manufacturer maintenance instructions to beneficiaries. They must also verify construction conformity with the documentation at key stages. Contractors may not change specified equipment types without the designer's consent.
In collective housing development projects, developers are required to equip living spaces with autonomous fire detectors, in addition to collective detection/signalling installations. This obligation applies to buildings for which the urban planning certificate was issued after 13 March 2026.